My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 03-13-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
03-13-2017
>
5.2 ERMUSR 03-13-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 12:38:46 PM
Creation date
3/10/2017 12:38:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Tom Sagstetter—Conservation and Key Accounts <br /> John Dietz—Chair Manager <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> March 13, 2017 5.2 <br /> SUBJECT: <br /> Landfill Gas Plant to Electric Generation Facility Performance for 2016 <br /> BACKGROUND: <br /> Each year ERMU can provide bonus payments to Sherburne County and the Waste <br /> Management/Elk River Landfill provided the financial means and plant capacity factors are met. <br /> DISCUSSION: <br /> For the calendar year of 2016 the landfill gas plant had a capacity factor of 93.68%and <br /> generated approximately 25 million kWh. 2016 was a challenging year and the production level <br /> fell below the 95%capacity factor threshold; therefore no bonus payment was made to Waste <br /> Management or Sherburne County. Some of the challenges include the catastrophic failure of an <br /> engine in March, and a change in the regular scheduled maintenance protocol. As a result of the <br /> engine failure energy production decreased. <br /> Despite the challenges the plant still produced approximately 25 million kWh which is enough <br /> electricity to supply 2,850 average residential customers in Elk River for one year. The landfill <br /> gas to electric plant generated the equivalent of 8.5% of ERMU total sales for 2016. <br /> The bonus payments are not guaranteed and can change or be eliminated based on the variability <br /> of labor, material, unexpected or increased maintenance costs, or loss of production for various <br /> reasons. <br /> ATTACHMENTS: <br /> • Letter to Waste Management—LFG to Electric Generation Facility Performance for 2016 <br /> • Letter to Sherburne County—LFG to Electric Generation Facility Performance for 2016 <br /> Po ■ EREU BY <br /> I, <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider POWERED To SERVE <br /> 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.