My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 02-22-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
02/22/1999
>
8.1. SR 02-22-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:11 AM
Creation date
2/14/2005 2:41:09 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/22/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />February 22, 1999 <br />File: 800110J-0069 <br /> <br />/tJ~ <br />q\ <br />. ~Ityvl q I <br /> <br />CITY OF ELK RIVER-SHERBURNE COUNTY <br />CSAH 12/CSAH 13 FUNDING AGREEMENT <br /> <br />The City of Elk River and Sherburne County agree to the following conditions regarding the <br />funding of CSAH 12 and CSAH 13: <br /> <br />1. <br /> <br />Sherburne County will place its' CSAH 13 designation on the newly constructed road <br />north of CSAH 12 and turn back to the City of Elk River the existing CSAH 13 alignment. <br />The existing CSAH 13 is in reasonably good shape having been overlayed in the late <br />1980's, however, the new road will be in substantially better shape and will have a much <br />longer life cycle prior to needing any significant maintenance. Therefore, Sherburne <br />County will reimburse the City of Elk River, the equivalent cost of a 1-1/2 inch overlay on <br />the turnback portion of old CSAH 13. <br />The City of Elk River agrees that the construction of the realigned portion of CSAH 13 <br />north of CSAH 12, including any land acquisition necessary, will be funded entirely by <br />the City of Elk River with no contribution from Sherburne County. <br />The City of Elk River will overlay CSAH 13 from the point of the new construction to the <br />intersection of Tyler Street. This is approximately 1-1/2 miles. This again would be at <br />no cost to Sherburne County. <br />The City of Elk River will install a signal system at the intersection of old CSAH 13/CSAH <br />12/Main Street at no cost to Sherburne County. <br />When a signal system is warranted at the intersection of CSAH 12, realigned CSAH 13, <br />and Tyler Street, Sherburne County will fund 75 percent of the signal system and the <br />City of Elk River will fund 25 percent of the signal system. This funding scenario is <br />based on the jurisdiction of the legs entering the intersection. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />o.lprpj.l800110J.csah12.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.