Laserfiche WebLink
EGty1� ,.,�� Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 7.2 <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearin s February 21, 2017 BrieAnna Simon, Planner <br /> Item Description Reviewed by <br /> Zone Change and Conditional Use Permit to Allow Zack Carlton,Planning Manager <br /> Gravel Mining,Tiller Corporation Reviewed by <br /> Cal Portner, City Administrator <br /> Action Requested <br /> Adopt,by motion, an ordinance amending the Zoning Map to add the Mineral Excavation Overlay <br /> District to certain property,with the condition Conditional Use Permit CU 17-01 is approved and all <br /> conditions met prior to recording. <br /> Approve,by motion, the Conditional Use Permit (CUP) to allow mineral extraction activities with the <br /> following conditions: <br /> 1. If the proposed site improvements described in the application and CUP have not been <br /> substantially completed within two years of the CUP's date of approval, the permit shall expire <br /> and become void. <br /> 2. The CUP shall expire if the authorized use ceases for more than six months. Failure to obtain an <br /> annual license will be evidence of cessation of use. <br /> 3. The applicant must apply for and receive approval of all required permits before any construction <br /> may begin. <br /> 4. A mineral extraction license shall be obtained annually. <br /> 5. Setbacks of 50 feet from Baldwin Ave and PID#75-103-3100 shall be maintained. Setbacks of 30 <br /> feet from US Hwy 169 and PID#75-103-4201 shall be maintained. Setback of 30 feet from the <br /> north property line, unless mining collaboration agreement across property lines is confirmed. No <br /> mining activity shall be permitted within the setback area without staff approval. <br /> 6. The need of buffering and/or screening in light of surrounding land uses shall be evaluated at the <br /> time of annual license renewal and shall be installed when directed by the city to protect <br /> surrounding land uses. <br /> 7. The applicant shall be responsible for the cost and construction of all road improvements, <br /> including turn lanes, as required by the township, Sherburne County or MnDOT. The city <br /> reserves the right to require the applicant to pay for road maintenance of haul routes. <br /> 8. The applicant shall work with the city engineer to locate the berming along Baldwin Street NW. <br /> 9. Wash operations shall not be permitted unless a plan for protecting ground water and <br /> surrounding environment is approved by the city's environmental consultant. <br /> 10. Dust control is required for all roads and within the site in accordance with air pollution standards <br /> and to ensure dust does not create a public nuisance or otherwise adversely affecting adjacent <br /> properties. <br /> 11. All activities on the site shall be conducted in a manner that is consistent with operating permits <br /> issued by the city, county, state,federal and other agencies. A copy of any and all permits related <br /> to the operation of the site shall be submitted to the city for their reference. <br /> POWERED 6T <br /> A IR <br />