My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 01-10-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
01-10-2017
>
6.1c ERMUSR 01-10-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 11:53:30 AM
Creation date
1/10/2017 11:53:30 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> January 10, 2017 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had four new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue the tear down of the old infrastructure in River Ranch development. <br /> • Finished feeder 42 line extension. <br /> • Finished making up the underground infrastructure on Quantrelle Avenue in Otsego. This <br /> is to feed the Nystrom building. We also hooked up the temporary service for the <br /> building. <br /> • Presidential Estates rebuild is on hold until spring when the frost comes out. <br /> • Finished replacing some LED light fixtures on Jackson Avenue and School Street. We <br /> are going to be changing out the lights on Twin Lakes Road to LED next. <br /> • Changed out fourteen lights to LED for the City on the walk bridge over Hwy 169 by the <br /> Freeport water tower. <br /> • A vehicle went off the road on County Road 39 and hit a single phase pole in Otsego. We <br /> were able to temporary it and replace the pole the following day. <br /> • Had to replace a street light pole on Vance Circle that was struck by a vehicle. <br /> • Started tree trimming. <br /> • Started rebuilding 165th Ave;this is in Area 2 that we recently acquired from Connexus. <br /> • Completed inventory count and are now working with the office to ensure the accuracy. <br /> • Scott Thoreson, Darren Weber and Jared Rolstad attended the MMUA Transformer <br /> School December 13-16 in Marshall, MN. <br /> • Tom Geiser and I attended the Technical & Operations Conference that Minnesota <br /> Municipal Utilities Association (MMUA)held in St. Cloud, MN. They had some very <br /> good speakers. A few of the sessions I attended were: Quality Leadership, Creating an <br /> Empowerment Culture, Advancing the Safety Culture, Reliability Best Practices, Cold <br /> Weather Rule, Cyber Security, and an MMUA update. <br /> POWERED BY <br /> Page 1 of 1 NATURE <br /> IMReliable Public' <br /> Power Provider POWERED T o S ERY E <br /> 141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.