My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.C. ERMUSR 12-13-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
12-13-2016
>
6.1.C. ERMUSR 12-13-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 3:53:01 PM
Creation date
12/9/2016 3:53:01 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. h <br /> Elk Riv <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 13, 2016 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had nine new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue the tear down of the old infrastructure in the River Ranch development. <br /> • We have all the wire installed on feeder 42 line extension. We have to finish making up <br /> the switchgear cabinets. <br /> • Installed the primary, transformer and street lights for Heritage Maples Senior Living <br /> building located on the south side of HWY 10 west of Waco Street. <br /> • Installed five new pedestals for the West Oaks 9th Addition; this was originally plotted <br /> for townhomes and was changed to single family homes. <br /> • Nystrom is building a new office on Quantrelle Avenue in Otsego. Michels Corporation <br /> is installing the wire and we are setting the switchgear, box pads, transformers and street <br /> lights. <br /> • Started rebuilding Presidential Estates and will continue to work on this project until the <br /> frost puts a stop to it. Next spring we plan to resume and complete the project. <br /> • Began replacing some LED light fixtures on Jackson Avenue, School Street and Twin <br /> Lakes Road. <br /> • Put a new service in for the weigh station on Hwy 10 in the territory we recently acquired <br /> from Connexus. <br /> • Replaced a three phase transformer at Plaisted Companies Peat Plant as they had backed <br /> into it with their pay loader. <br /> P O W E 6 E U B Y <br /> ® Page 1 of 1 NATURE <br /> PowerReliablPublic <br /> Provider <br /> Poweneo To Soave <br /> 1nR <br />
The URL can be used to link to this page
Your browser does not support the video tag.