Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Tom Sagstetter—Conservation and Key Accounts <br /> John Dietz—Chair Manager <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 15, 2016 4.1 <br /> SUBJECT: <br /> Cost of Service and Rate Design Study <br /> BACKGROUND: <br /> ERMU staff is has been working with Dave Berg Consulting, LLC on a cost-of-service and rate <br /> design study. The work was done to evaluate possible changes to rates and services that are a <br /> result of changing conditions, including but not limited to; additional customers and energy sales <br /> from the transfer of territory from Connexus Energy to ERMU, and the transition from our <br /> current wholesale power supplier to Minnesota Municipal Power Agency in October of 2018. <br /> DISCUSSION: <br /> Mr. Berg will present the findings of the final report and answer any questions the Commission <br /> may have. <br /> ACTIONS REQUESTED: <br /> Receive the Final Electric Cost of Service and Rate Design Study prepared by Dave Berg <br /> Consulting, LLC. <br /> ATTACHMENT: <br /> • Final Report—Electric Cost of Service and Rate Design Study <br /> POWERED BY <br /> 1.1 <br /> Page 1 of NACURE <br /> Reliable Public <br /> Power Provider P w A a.E o T o SERVE <br />