My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.0. PRSR 11-09-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2016
>
11-09-2016
>
8.0. PRSR 11-09-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2016 2:59:47 PM
Creation date
11/7/2016 2:59:47 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
11/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y/! Item 9 <br /> City of <br /> Elly Memorandum <br /> River <br /> To: Parks and Recreation Commission <br /> From: Michael Hecker,Parks and Recreation Director <br /> Date: November 9,2016 <br /> Subject: Director's Report <br /> This report is a monthly highlight of department activities related to collaboration, strategic <br /> planning, staff changes/developments, and park operations. <br /> River Edge Commons Park Expansion <br /> Rivers Edge Commons construction is continuing to progress. Sunram Construction's electrical <br /> subcontractor completed work on all below grade electrical improvements earlier this week and <br /> installed the new cabinet that will house the electrical controls as well as the WiFi equipment. They <br /> will complete the final electrical connections in the cabinet by early next week. Sunram's primary <br /> crew is continuing to set the stone seat walls in place this week and intends to be complete with the <br /> seat walls early next week. Once complete with the seat walls they will begin work on final grading <br /> in preparation for pavers, concrete curbing and asphalt. This work could begin as early as next week <br /> Wednesday,however will depend on subcontractor scheduling. <br /> All hard surfaces are scheduled to be complete by November 18th. Irrigation, turf and landscaping <br /> will be conducted in the next two weeks. The project is currently slated to be substantially complete <br /> by the end of November. Delays resulting in the later completion date included the additional <br /> electrical conduit, changes to the storm water plan, and weather and crew availability by the <br /> contractor who is conducting a trail project in Rogers. The trail project in Rogers is wrapping up <br /> this week which should allow the contractor to shift focus back to Rivers Edge Commons. The <br /> project must be completed in May,2017. <br /> William H. Houlton Conservation Area—A Map Guide Destination <br /> The William H. Houlton Conservation Area (WHHCA) recently received recognition from the <br /> National Geographic Mississippi River Geotourism Program for its valuable contribution to the <br /> Mississippi River Geotourism Program. The FMR (Friends of the Mississippi River) nominated the <br /> WHHCA to this program because of the WHHCA support in sustaining and enhancing the unique <br /> geographic character of the region through its commitment to aesthetics, culture, environment, <br /> heritage and the wellbeing of the regions'residents. Visit www.MississippiRiver.NatGeotourism.com <br /> for more information on this National Geographic program including unique pictures of the <br /> WHHCA that were taken by a drone. <br /> PYR / ERER BY <br /> N:\Departments\Parks and Recreation\Commission\Packets\2016\11-09-16 PRC Packet\Director's Report 11-09-16.docx NATURE'URE <br />
The URL can be used to link to this page
Your browser does not support the video tag.