My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.0. PRSR HANDOUT 08-10-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2016
>
08-10-2016
>
8.0. PRSR HANDOUT 08-10-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 10:23:05 AM
Creation date
8/12/2016 10:23:04 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
8/10/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Main Street <br /> Upper <br /> Fountain <br /> Temporary Fence <br /> C <br /> i <br /> i <br /> I <br /> p+� Existing <br /> V' ,i <br /> ori ar Stairs <br /> ,t (.oi��� !/ - , <br /> / a <br /> New Upper ;. -s- ' . 4' K <br /> /Terrace -j a+ a, 4e4 <br /> t ,' •.. r Expanded a r <br /> `New Retaining Wall ,- r 4a Seating 'al <br /> • • <br /> 4. <br /> —CI <br /> - _ --r"kt♦ .. is • .p.' <br /> New Stairway I v <br /> Lower Parking Lot Closed T with Landings '_ ii Expanded Stage .00` <br /> This Fall for Construction i t 00 <br /> 'r: New Stage " l ` <br /> "' Access Trail - II .. to %` <br /> _.. <br /> to <br /> Existing Shelter- -_. <br /> i <br /> 00 <br /> to <br /> to <br /> % - i <br /> Mississippi River <br /> ©© Landscape Architect: BKBM : Civil Engineer: Electrical Engineer: Contractor: <br /> mu Hoisington Koegler Group,Inc ROM Engineers et-II EDI-Engineering Design Initiative Sunram Construction <br /> • Construction begins on August 22, 2016. <br /> • Substantial completion by October 1, 2016. I <br /> ■ Final completion in the Spring of 2017. <br /> ■ Begining August 22 the lower city parking lot will be closed to provide a staging area for construction. A construction <br /> fence will be installed between the Elk River Lutheran Church and the city parking lots, as well as aroud the top of the <br /> existing plaza to prevent access to the construction site. <br /> ■ Once complete this expansion will nearly double the seating capacity for the summer concert series and provide an <br /> exceptional venue for weddings. <br /> If you have any questions,please contact Parks and Recreation Director Michael Hecker at 763.635.1161 or <br /> mhecker@ElkRiverMN.gov <br /> r <br /> City of <br /> Elk <br /> River <br />
The URL can be used to link to this page
Your browser does not support the video tag.