My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.c. ERMUSR 08-09-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
08-09-2016
>
6.1.c. ERMUSR 08-09-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 10:27:23 AM
Creation date
8/8/2016 10:27:23 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> August 9, 2016 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had ten new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue rebuilding River Ranch in Otsego. <br /> • Continue working on changing out some of the rusty junction boxes and removing ones <br /> that are no longer necessary. During the process of going through these areas,we also <br /> install fuse pads for better sectionalizing when a fault occurs. <br /> • Installing a new three phase service for P&F Machining in Otsego. The City of Otsego is <br /> also extending the road south of Twin City Orthopedics which will need infrastructure <br /> installed once they get the right of way to rough grade. <br /> • Started installing a new feeder that will run from the east side of HWY 169 by GRE to <br /> the east side of HWY 10 across from Nature's Edge Business Center. This feeder will <br /> give us a feeder loop under HWY 10 to be used when we acquire area two from <br /> Connexus. <br /> • Changed out five of the eight poles that didn't pass inspection. We're looking at <br /> underground options for the other three poles. <br /> 'POWERED I , <br /> El Page 1 of 1 NATURE <br /> Reliable Public <br /> PowerP der POWERED To SERVE <br /> 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.