Laserfiche WebLink
City of <br />Elk — <br />River <br />Request for Action <br />To <br />Item Number <br />Mayor and City Council <br />9.1 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Work SessionJuly <br />18, 2016 <br />Justin Femrite, P.E., City Engineer <br />Item Description <br />Reviewed by <br />Line Avenue Traffic Operations Study <br />Cal Portner, City Administrator <br />Reviewed by <br />Action Requested <br />Discuss the Line Avenue Traffic Operations Study and provide direction for implementation of study <br />recommendations. <br />Background/Discussion <br />The Line Avenue Traffic Operations Study has been completed by the traffic engineering firm Spack <br />Consulting. <br />The purpose of this study was to determine if any modifications should be made along Line Avenue <br />between Main Street/1815` Avenue and Twin Lakes Road. The study included looking at potential <br />impacts to surrounding intersections if Line Avenue was converted to a cul-de-sac between Main <br />Street/181st Avenue and Twin Lakes Road. <br />The consultant will present the results of the study. <br />Financial Impact <br />There is no financial impact associated with this item. <br />Attachments <br />■ Line Avenue Traffic Operations Study <br />P a w E A E U a r <br />NaA f RE] <br />