Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Tom Sagstetter—Conservation and Key Accounts <br /> John Dietz—Chair Manager <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> June 14th, 2016 2.6 <br /> SUBJECT: <br /> Consulting Services for Electric Cost-of-Service and Rate Design Study <br /> BACKGROUND: <br /> ERMU staff is currently working with Dave Berg Consulting, LLC on a cost-of-service and rate <br /> design study. The work is being performed to evaluate possible changes to rates and services <br /> that are a result of changing conditions, including but not limited to; additional customers and <br /> energy sales from the transfer of territory from Connexus Energy to ERMU, and the transition <br /> from our current wholesale power supplier to Minnesota Municipal Power Agency in October of <br /> 2018. <br /> DISCUSSION: <br /> The budgeted cost of the study is $25,000 and is scheduled to be completed by September 2016. <br /> ACTIONS REQUESTED: <br /> No action is required at this time. <br /> ATTACHMENT: <br /> • Scope of Services for Electric Cost-of-Service and Rate Design Study—Dave Berg <br /> Consulting, LLC. <br /> • Task Order#2—Dave Berg Consulting, LLC. —March 2, 2016 <br /> POPEOEO BY <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> f <br /> Power Provider P OWERED T O S ERV E <br /> 66 <br />