My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. LIBSR 05-24-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Packets
>
2010-2019
>
2016
>
05-24-2016
>
5.4. LIBSR 05-24-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 10:36:52 AM
Creation date
5/18/2016 10:36:51 AM
Metadata
Fields
Template:
City Government
type
LIBSR
date
5/24/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City()f <br /> E]„1� Staff Report <br /> River <br /> To Item Number <br /> Library Board ll(,r(, tt'Xtt <br /> Agenda Section Meeting Date Prepared by <br /> ll(,r(, to tc t. ll(,r(, to Building Maintenance Supervisor <br /> Item Description Reviewed by <br /> Facility Maintenance Update <br /> Reviewed by <br /> Action Requested <br /> None <br /> Background/Discussion <br /> Sheridan Sheet Metal has still not got back to me on an exact date as to when they can do the gutter <br /> work but I was promised a date very soon. <br /> The LED can lights for the interior are in and staff has replaced the majority of them. We will be bringing <br /> in our lift equipment hopefully on Monday May 16lhto finish. <br /> Staff began some painting projects in several areas throughout the facility and this should be completed <br /> within the next week or two. <br /> Financial Impact <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.