My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4B. SR 04-18-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
04-18-2016
>
7.4B. SR 04-18-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 11:53:16 AM
Creation date
4/15/2016 3:28:05 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EOty1� ,.,�� Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 7.4.B <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearin s Aril 18, 2016 Chris Leeseber , Senior Planner <br /> Item Description Reviewed by <br /> Tim Jeske—21475 Highway 169 NW Zack Carlton,Planning Manager <br /> ■ Easement vacation Reviewed by <br /> Action Requested <br /> Adopt,by resolution, the Easement Vacation request as proposed. <br /> Background/Discussion <br /> Case No. EV 16-10 <br /> The applicant submitted a Final Plat but it was determined that a wetland delineation was needed. Due to <br /> weather conditions and timing, the wetland delineation was not able to be completed until April 12. The <br /> revised Final Plat and easement vacation exhibit is expected to be ready by the council meeting on April <br /> 18, 2016. Staff will provide the revised information and a resolution to the council at the meeting,if it is <br /> not available, staff will recommend the item be postponed until May 16, 2016. <br /> As a result of re-platting of the property (P 16-04), there will be a section of the typical 5 foot easement <br /> located in the interior of the newly platted parcel that is no longer needed. It is anticipated that all <br /> easements on Lot 3, Block 1, of Meadows of Elk River will be vacated and reestablished with the <br /> Meadows of Elk River Second Addition Plat. <br /> The attached Final Plat does not accurately represent what is being proposed to be vacated. <br /> Financial Impact <br /> None <br /> Attachments <br /> ■ Location Map <br /> ■ Final Plat (without updated wetland delineation) <br /> ■ Resolution (Will be handed out on Monday <br /> POWERED 6T <br /> AR <br />
The URL can be used to link to this page
Your browser does not support the video tag.