Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> April 12, 2016 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had seven new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • The frost is out so we started boring again. We are placing underground wire at Ulysses <br /> and 171st Avenue. <br /> • Continue rebuilding the overhead line on the east side of HWY 169 south of Co. Rd. 33 <br /> to 197th Ave. <br /> • Diversified did our annual inspections on the bucket and digger trucks. The inspections <br /> included: Visual/Operational,Magnetic Particle, Dielectric, and Load and Acoustic <br /> Emission Testing. <br /> • Finished tree trimming for now. <br /> • Started rebuilding River Ranch in Otsego. This is the third year of this project and we <br /> hope to have it completed this year. We are replacing the rear lot line overhead with front <br /> lot line underground. <br /> • At the Police Departments recommendation, we're installing some street lights at certain <br /> intersections and entrances around town <br /> • We have ordered the Vac-Tron,which was a budgeted item, through the NJPA contract. <br /> We also received the bore rig truck through the State of Minnesota contract and are in the <br /> process of getting the bed installed. The other vehicles that were budgeted for have not <br /> been ordered yet and will come before the commission prior to ordering them. <br /> • I attended the American Public Power Association(APPA) Engineering and Operations <br /> Technical Conference. Some of the breakout sessions I attended where: Finding a Way <br /> for Transmission and Distribution Rights-of-Way and Getting Permits, Situation <br /> Awareness to Reduce Human Error, AMI Planning and Deployment, LED Streetlighting <br /> PyOWERED BY <br /> Mq <br /> Page 1 of 2 NATURE <br /> Reliable Public, <br /> Power Provider P oWE 0.E D T O S ERV E <br /> 232 <br />