My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0. EDSR 07-11-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1994
>
07-11-1994
>
6.0. EDSR 07-11-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 10:12:50 AM
Creation date
3/4/2016 10:12:50 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
7/11/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pk.? AK. <br /> c0, <br /> ty of � MEMORANDUM <br /> 1kRjver TO: BILL RUBIN, EXECUTIVE DIRECTOR <br /> EDA COMMISSIONERS <br /> FROM: PHIL HALS, STREET/PARK SUPT. <br /> DATE: JULY 7, 1994 <br /> SUBJECT: EDA SITE <br /> Due to an excess of fill material on the Jackson Road and School Street <br /> project, the possibility of filling the Main Street redevelopment site has <br /> become much more attractive financially. The dirt will be furnished and <br /> delivered without cost and the other development costs will vary widely with <br /> the level of refinements that are included in the project. <br /> The improvements that I would suggest at this time would be: <br /> Remove the concrete block wall that is above the alley level on the <br /> • west side of the site <br /> Remove the concrete floor from the site as is now stands. All city <br /> equipment - no out of pocket cost. <br /> 7,000 cubic yards fill material- no out of pocket cost. <br /> Level and compact fill material (eqpt. rental) $ 3,500 <br /> Proposal A $40,000 <br /> Proposal B $32,000 <br /> Proposal C $28,000 <br /> Copies of the construction proposals will be available as handouts at <br /> Monday's meeting. <br /> Attached to this memo is the estimate that involved having to purchase the <br /> fill material and have it delivered. The cost of$28,000 for site improvements <br /> remains close to the estimates for the most current proposals. <br /> • <br /> P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.