My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0. EDSR 07-10-2000
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
2000
>
07-10-2000
>
6.0. EDSR 07-10-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 2:40:37 PM
Creation date
2/18/2016 2:40:30 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
7/10/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( Item # 6. <br /> ty of <br /> lkRiver <br /> MEMORANDUM <br /> TO: Economic Development Authority <br /> FROM: Marc Nevinski, Assistant Director of <br /> Economic Development <br /> DATE: July 10, 2000 <br /> SUBJECT: ANC /Opus Proposal <br /> Issue <br /> A proposal has been submitted by Opus Northwest, in conjunction with <br /> Advanced Nutrionals Corporation/PouchPac Industries (ANC) to <br /> develop the 14.97 acre Emmerich property in the West Business Park. <br /> Opus and ANC are requesting that pay-as-you-go Tax Increment <br /> Financing be used to write down the land costs. <br /> Background <br /> ANC intends to build a state of the art plant in Elk River that will <br /> produce, package, and distribute beverage products in stand-up <br /> flexible pouches. The facility will be built by Opus Northwest and will <br /> consist of a premium fabcon concrete structure of approximately <br /> 75,000 square feet in Phase I and may approach 200,000 square feet in <br /> subsequent expansions. Six thirty-seven foot storage tanks will be <br /> included in the design of the building and will require a conditional use <br /> permit. ANC plans to employ approximately 50 people with the initial <br /> phase and up to 200 with subsequent expansions. Many of the jobs <br /> will be technically oriented and will command higher wages. <br /> Staff has proposed the following financial package for the project: <br /> • Refund 100% of land costs over a 4-5 year period (interest rate to <br /> be negotiated). <br /> • $100,000 micro-loan at four (4) points below prime <br /> • 20% reduction in water rates for a three-year period of all water <br /> usage in excess of 2,000,000 gallons per month. <br /> As is often the case, this project is on a very tight schedule and staff is <br /> doing its best to accommodate the timeframe where possible. Opus <br /> and ANC are in the process of completing the necessary paperwork, <br /> 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD&Phone: (612) 441-7420 • Fax: (612)441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.