Laserfiche WebLink
Marc Nevinski <br /> 0rom: Marc Nevinski [mnevinski@ci.elk-river.mn.us] <br /> ent: Thursday, April 27, 2000 3:47 PM <br /> o: 'Mark Jenson'; Harlan Jacobs (E-mail) / <br /> Subject: RE: [Fwd: Elk River Incubator Facilities] (4 <br /> Harlan and Mark, <br /> I have checked with our building inspectors regarding the septic system ii <br /> at the incubator and their response is that the system is already <br /> overloaded. Apparently the drainfields were designed only to accomodate <br /> the restroom facilities and only as a temporary fix. Subsequnetly,the <br /> septic system would be ruined almost instantly by 300 gallons per day. <br /> Sewer and water is not far from the incubator. It extends along highway <br /> 10 as far east as 171st Ave (i.e. Stoplight by Bridgemans) . I am looking <br /> into what plans are in place for extending it further east down hwy 10. <br /> The planning dept. tells me that any extentions will likely be developer <br /> driven and a meaningful time frame for that is unknown. <br /> I will pass this information on the Larry Hickman and the EDA. <br /> Sincerely <br /> Marc <br /> Original Message <br /> From: Mark Jenson [mailto:mljenson@ecenet.com] <br /> Sent: Thursday, April 27, 2000 1:48 PM <br /> To: Marc Nevinski <br /> •ubiect: <br /> [Fwd: Elk River Incubator Facilities] <br /> Hi Marc, <br /> Here is a copy of a letter I sent to Harlan Jacobs detailing the changes <br /> needed for the Elk River facility. It includes the estimated water <br /> consumption both immediate and further out. <br /> Mark <br /> 41111 <br />