My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.0. HRSR 11-27-2000
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2000-2009
>
2000
>
11-27-2000
>
5.0. HRSR 11-27-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 2:37:12 PM
Creation date
1/13/2016 2:37:12 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
11/27/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER HOUSING AND REDEVELOPMENemATHORITY <br /> MEMORANDUM <br /> TO: Housing and Redevelopment Authority <br /> FROM: Pat Klaers, City Admi •:If.tor <br /> DATE: November 27, 2000 <br /> SUBJECT: Downtown Sidewalks <br /> Since the joint HRA/City Council meeting, staff has had a number of <br /> meetings and site visits regarding the downtown sidewalks issue. Staff has <br /> reached a consensus for a few recommendations to the HRA and is still, <br /> waiting for some additional information and meetings to take place before <br /> additional recommendations can be made. <br /> At the 11/27/00 HRA meeting, staff will present a verbal update and <br /> recommendation on the downtown sidewalk redevelopment area and the <br /> preferred design for new downtown sidewalks. <br /> Additionally, staff will discuss with the HRA some cost, funding, and timing <br /> information regarding this anticipated project. The timing of the project <br /> depends on a number of things including not wanting to disturb or upset the <br /> June 23 and 24 Art Soup Festival that is planned to take place in the <br /> downtown area. A more significant consideration for the timing of the project <br /> relates to the summer 2001 electric utilities project whereby they will be <br /> relocating electric lines underneath the sidewalks on either the north or <br /> south side in the downtown area. <br /> Regarding the cost of the project, we need to meet with Mr. Plaisted and <br /> reach some agreement on the "cost per unit" of the sidewalk. This is <br /> important because if his product goes into the King and Main corner, then <br /> that same product must be used throughout the downtown area or else it will <br /> not match. A different product from a different company will look different so <br /> some type of maximum price per unit needs to be established. <br /> Obviously, at this time nothing is finalized regarding this project and staff <br /> looks forward to HRA input on the above issues. <br /> • <br /> P.O. Box 490 • 13065 Orono Parkway • Elk River, MN 55330-1743 • (612)441-7420 • Fax: (612) 441-7425 <br /> Equal Opportunity Housing and Equal Opportunity Employment <br />
The URL can be used to link to this page
Your browser does not support the video tag.