Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 17, 2015 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had nine new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue working on changing out some of the rusty junction boxes or removing ones <br /> that are no longer necessary. <br /> • Continue working on changing out fuse pads. This has been an ongoing project that had <br /> to be done due to our high fault current. <br /> • Continue rebuilding River Ranch in Otsego as time permits. The bore rig crew has been <br /> working on the installation of wire in the Connexus acquisition area. <br /> • Continue working on installing a new feeder out of the Waco substation to the court <br /> house area. <br /> • Continue installing wire for 16 new residential lots in Prestigious Woodland Hills Third <br /> Addition. <br /> • Continue to replace stickers and locks on the equipment in the Connexus acquisition area. <br /> While we're doing this, we'll make any necessary changes to the maps and make notes <br /> on what needs to be fixed. <br /> • Replaced a pole with a feeder riser and switch on the southwest corner of HWY 169 and <br /> 197`h Avenue after a car hit the pole. <br /> • Installed wire and a transformer for Sportech. <br /> • Installed a three phase primary loop between Cornerstone KIA and Preferred Powder <br /> Coat. <br /> • Scott Thoreson,Matt Schwartz and Aaron White went to Shakopee to assist with building <br /> the field for the 2016 Lineworkers Rodeo. <br /> POWERED OV iq <br /> Page 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P OWE 0.E D T o SERV E <br /> 164 <br />