Laserfiche WebLink
Elk River . <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> October 13, 2015 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had seven new services. <br /> • Continue working on collecting data with the GPS for our Arc View maps as time <br /> permits. <br /> • Continue working on changing out some of the rusty junction boxes or removing ones <br /> that are no longer necessary. <br /> • Continue working on changing out fuse pads. This has been an ongoing project that had <br /> to be done due to our high fault current. <br /> • Put rebuilding River Ranch in Otsego on hold until we have the new feeder from the <br /> Waco substation to the court house area completed. <br /> • Continue working on installing a new feeder out of the Waco substation the court house <br /> area. <br /> • Started installing wire for 16 new residential lots in Prestigious Woodland Hills Third <br /> Addition. <br /> • Changed out a single phase pole and hung a larger transformer to address a voltage <br /> complaint for the cell tower on 205th Ave. <br /> • A driver of a gravel truck that forgot to put his box down hit two single phase taps and <br /> broke a pole after they hit the secondary service. <br /> • Working on installation of a pole and blades for the County Road 12 Interconnection with <br /> Connexus. We've also begun the process of replacing the stickers and locks on the <br /> equipment with ours. While we're doing this, we'll make any necessary changes to the <br /> maps and make notes on what needs to be fixed. <br /> Zt, <br /> PrOWEDED IT <br /> Page 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P 0 WE 0.E D T O S F R Y E <br /> 90 <br />