My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e. ERMUSR 09-08-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2015
>
09-08-2015
>
6.1e. ERMUSR 09-08-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 12:16:49 PM
Creation date
9/22/2015 11:50:46 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 8, 2015 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered seven new residential water meters. <br /> • Sealed the water meter, and took curb stop ties from ten water services. <br /> • Turned on one water service. <br /> • Went on six service calls. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards. <br /> • Completed one MDH mandated validation fluoride sample. <br /> • Completed two THM/HAA5 samples mandated by the MDH. <br /> • Completed 6 nitrate samples mandated by the MDH. <br /> • The water operators have been very busy servicing fire hydrants. So far they've <br /> completed 338 of 422 hydrants scheduled for maintenance in 2015. All of the private <br /> hydrants have been completed and all of the customers on the private hydrant <br /> maintenance program have been sent copies of their inspection reports. The fire marshal <br /> will also receive a copy of each inspection. After the scheduled hydrants are completed, <br /> they will be moving onto the hydrants the HOG Chapter will be painting on September <br /> 20. In all,more than 500 hydrants will receive maintenance this year. <br /> • Slack Painting washed the exterior, and repaired approximately 100 spots on the Auburn <br /> Tower. We also repaired many spots last year. The Auburn Tower is scheduled for a full <br /> recondition in the next few years. I have attached a picture of the crew washing the tower. <br /> • Troy Adams, Mark Fuchs, Justin Femrite, Peter Beck, and I met with Alex Bodnar. We <br /> laid out a few options for the Heritage Park Development. We will wait and see what <br /> route he takes. <br /> ATTACHEMENTS: <br /> • August Pumping By Well <br /> IN POWRED 8Y <br /> Page 1 of 2 <br /> Reliable Public <br /> Power Provider P w To S E R v e <br /> 191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.