Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 8, 2015 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered seven new residential water meters. <br /> • Sealed the water meter, and took curb stop ties from ten water services. <br /> • Turned on one water service. <br /> • Went on six service calls. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards. <br /> • Completed one MDH mandated validation fluoride sample. <br /> • Completed two THM/HAA5 samples mandated by the MDH. <br /> • Completed 6 nitrate samples mandated by the MDH. <br /> • The water operators have been very busy servicing fire hydrants. So far they've <br /> completed 338 of 422 hydrants scheduled for maintenance in 2015. All of the private <br /> hydrants have been completed and all of the customers on the private hydrant <br /> maintenance program have been sent copies of their inspection reports. The fire marshal <br /> will also receive a copy of each inspection. After the scheduled hydrants are completed, <br /> they will be moving onto the hydrants the HOG Chapter will be painting on September <br /> 20. In all,more than 500 hydrants will receive maintenance this year. <br /> • Slack Painting washed the exterior, and repaired approximately 100 spots on the Auburn <br /> Tower. We also repaired many spots last year. The Auburn Tower is scheduled for a full <br /> recondition in the next few years. I have attached a picture of the crew washing the tower. <br /> • Troy Adams, Mark Fuchs, Justin Femrite, Peter Beck, and I met with Alex Bodnar. We <br /> laid out a few options for the Heritage Park Development. We will wait and see what <br /> route he takes. <br /> ATTACHEMENTS: <br /> • August Pumping By Well <br /> IN POWRED 8Y <br /> Page 1 of 2 <br /> Reliable Public <br /> Power Provider P w To S E R v e <br /> 191 <br />