My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.8. SR 04-20-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
04-20-2015
>
4.8. SR 04-20-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 10:22:12 AM
Creation date
4/17/2015 10:14:16 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�j <br /> Elk = - Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 4.8 <br /> Agenda Section Meeting Date Prepared by <br /> Consent Aril 20, 2015 Justin Femrite, P.E., City Engineer <br /> Item Description Reviewed by <br /> 2015 Street Improvement Project Cal Portner, City Administrator <br /> A. Resolution Accepting Bid and Authorizing Reviewed by <br /> Execution of Contract <br /> B. Change Order #1 <br /> Action Requested <br /> The City Council is asked to consider the following actions: <br /> 1. Adopt resolution accepting the bid and authorizing the execution of a contract with North Valley, <br /> Inc. for the construction of the 2015 Street Improvement project. <br /> 2. Direct staff to prepare Change Order# 1 adding the mill and overlay of 196 'Avenue between <br /> CSAH 1 and Lander Street to the project. <br /> Background/Discussion <br /> Bids were received on April 14, 2015, for the 2015 Street Improvement Project. Six bids were received <br /> ranging from $3,732,193.14 to $4,799,038.98. The bid tabulation is attached. The low bid was submitted <br /> by North Valley, Inc. <br /> Afforded by combination of both favorable pricing on the project and the flexibility of our pavement <br /> management funding, staff is asking to include an additional segment of street into this year's project. <br /> The addition would include the milling and overlaying of 196th Avenue between County Road 1 and <br /> Lander Street. This segment was identified through our pavement ratings to be overlaid in 2019 but <br /> because its condition rapidly deteriorated over the past winter it cannot wait that long. If directed to <br /> move forward with the addition, staff will prepare a formal change order and bring it back for final <br /> approval when all costs have been finalized. <br /> Financial Impact <br /> Through the preliminary report and plan development phase of this project, the cost estimate for <br /> construction was $4,746,000. The low bid came in about $1,000,000 or 20% less than our estimate. This <br /> savings allows us the flexibility to consider the addition to the project as described above. The estimated <br /> cost for the added work on 196th Avenue is around $100,000. We have yet to learn of the final costs <br /> from the BNSF for their required work as part of our construction project. To date,we have included <br /> estimated costs for their work in the project budget. Staff is very comfortable with the addition of 196t' <br /> Avenue and still remaining well below the total project budget of$6,429,724 as detailed in the Capital <br /> Improvement Plan. <br /> Attachments <br /> • Resolution Accepting the Bids and Authorizing the Execution of the Contract. <br /> • Bid Tabulation <br /> P0WIeEa 0 <br /> Template Updated 4/14 INAWREJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.