Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk—Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> March 17, 2015 5.4 <br /> SUBJECT: <br /> Well#2 Project Update <br /> BACKGROUND: <br /> The Well#2 project started the week before Christmas and was completed on March 13tH <br /> The project involved: <br /> • Pulling and reconditioning the well <br /> • Replacing old pipes <br /> • Sandblasting and painting the filter <br /> • Painting the floor <br /> • Replacing T-12 fluorescent lights with T-8 fluorescent lights <br /> • Replacement of all chemical lines and conduits <br /> • Installing a new VFD <br /> DISCUSSION: <br /> The well is almost ready to go back online. We're just waiting for some water samples to come <br /> back and then we'll be able to start pumping again. I'll be presenting a slide show of before and <br /> after photos at the commission meeting. <br /> ACTION REQUESTED: <br /> There is no action requested. <br /> • [ OWERED AI <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T O S E '/ <br /> 68 <br />