My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.C.1. PRSR 10-10-20011
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2001
>
10-10-2001
>
9.C.1. PRSR 10-10-20011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 9:09:53 AM
Creation date
7/18/2014 9:09:53 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
10/10/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #9.C.I. <br /> ilk -�-� <br /> River <br /> 13065 Orono Parkway <br /> Elk River,MN 55330 MEMORANDUM <br /> TO: Park and Recreation Commission <br /> FROM: Michele McPherson`,Director of Planning <br /> DATE: October 10, 2001 <br /> SUBJECT: Waco Street Trail <br /> At the September Commission meeting,the location of the Waco Street trail was briefly <br /> discussed as the overall concept plan for the Elk Path Business Center development was <br /> reviewed. <br /> Attachments <br /> • • Master Park Plan Excerpt <br /> • Cover Sheet <br /> • Plan Sheet 26 <br /> • Plan Sheet 27 <br /> • Plan Sheet 28 <br /> The City recently completed the extension of Business Center Drive,installation of trunk sewer <br /> and water,and the realignment of Waco Street with Highway 10. During the reconstruction <br /> project, the City extended the sidewalk along the south side of Business Center Drive, <br /> constructed a new sidewalk from Highway 10 to approximately 3/8 mile north of County Road <br /> 30 on the east side of Waco, and also constructed a bituminous trail from Highway 10 to <br /> approximately the Business Center Drive/Waco Street intersection on the west side of Waco. <br /> Also in the area is the County Road 30 trail,located on the north side of County Road 30,which <br /> stops at the east edge of the Sandpiper Estates subdivision. <br /> The Master Park Plan indicates an extension of both the Waco Street and County Road 30 trails. <br /> As discussed during the Elk Path Business Center concept plan review,the County Road 30 trail <br /> as well as the sidewalk on Waco Street can be extended as the Elk Path Business Center <br /> develops. At some point in the future,Waco Street will need to be reconstructed and staff <br /> anticipates extending the bituminous trail along the west side of Waco Street south to County <br /> Road 30. <br /> Recommendation <br /> Staff requests that the Commission provide additional direction regarding this issue to staff. <br /> Phone:763.441.7420 <br /> Fax:763.441.7425 <br /> S:\PLANNING\MICHMC\PARKNREC\WacoTrail.doc <br /> www.ci.elk-river.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.