My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.C.1. PRSR 01-10-2001
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2001
>
01-10-2001
>
9.C.1. PRSR 01-10-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2014 2:40:49 PM
Creation date
7/16/2014 2:40:49 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
1/10/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ek? <br /> c <br /> Item # 9.C.1. <br /> • <br /> City of MEMORANDUM <br /> Elk ,. River <br /> TO: Park and Recreatio Commission <br /> FROM: Michele McPherso"r'irector of Planning <br /> DATE: January 10, 2001 <br /> SUBJECT: Review and Approve Trail Construction Standards <br /> Request <br /> The Commission is asked to review and approve a proposed trail construction <br /> standard for the construction of bituminous off-street trails. <br /> Attachments <br /> • • Bituminous Trail Typical Section <br /> • Pedestrian Curb Ramps for Trails <br /> • Aggregate Mixture <br /> • Thickness and Surface Smoothness Requirements <br /> • Longitudinal Deviation <br /> Analysis <br /> Staff has prepared the attached trail cross section and pedestrian curb ramp <br /> details for inclusion in the City's construction standards manual. These <br /> standards would be presented to developers for inclusion in their construction <br /> documents for the construction of off-street bituminous trails. These drawings <br /> and information reflect discussions conducted with staff and Commission Dave <br /> Anderson. We believe that these are manageable and cost-effective standards <br /> for trail construction. <br /> In order to maintain these standards and to insure proper installation, trail <br /> construction will be discussed as part of all pre-construction meetings and with all <br /> developers. Contractors will also be required to arrange inspection of the sub <br /> grade, aggregate base, and wear-course installation as well as restoration with <br /> superintendent Phil Hals. <br /> The typical trail section drawing will be revised to eliminate the point in the <br /> transition area between the trail and the side slopes. <br /> 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD & Phone (763) 441-7420 • Fax(763) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.