My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. ERMUSR 11-12-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
11-12-2013
>
5.3. ERMUSR 11-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2014 11:25:23 AM
Creation date
1/15/2014 11:25:23 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />• <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Troy Adams, P.E. —General Manager <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 12, 2013 5.3 <br /> SUBJECT: <br /> 2014 Budget: Rates and Review <br /> BACKGROUND: <br /> In preparation for budget approval in December, staff continues to work through the 2014 budget <br /> process. Based on the preliminary rate increase notifications and projected expense increases and <br /> capital expenditures, a preliminary balanced budget has been drafted. <br /> DISCUSSION: <br /> Electric Department Expense Budget <br /> As mentioned before, wholesale power costs makes up a considerable portion of the required <br /> operating revenue, approximately 72% for 2014, and the wholesale rates set by Great River <br />• <br /> Energy (GRE) have an enormous impact on ERMU's rates. The 2014 wholesale power rates <br /> have not yet been finalized by the GRE board but their preliminary rates are designed to <br /> provide a 0% increase in GRE revenue from wholesale power sales. (This was done by <br /> lowering all component rates except off peak energy, which was increased. This impacts our <br /> budget by .5%) As the budget with preliminary wholesale rates stand, we will need an <br /> increase of approximately 1.5% in revenue to recover the increases associated with the whole <br /> sale power costs as applied to the forecasted power sales, and remaining increased expenses. <br /> Notable items in the electric budget for 2014 are: <br /> • Continued current efficiency with the LFG plant in terms of higher production and <br /> lower maintenance <br /> • An estimate of 1%growth in usage <br /> • Funds for ERMU History Book update in anticipation of upcoming 100th year <br /> anniversary in 2015 <br /> • Mapping included $30,000 to include outside help for specialized areas <br /> • New NISC software and implementation costs <br /> • Consulting for Territory Acquisition <br /> .,-1 0 ` IRNERER IT <br /> Page I oft NATURE <br /> ) <br /> Reliable Public <br /> Power Provider PowERLo To SERVE <br /> 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.