Laserfiche WebLink
City of <br />Elk <br />Ri. ver <br />Request for Action <br />To <br />Item Number <br />Parks and Recreation Commission <br />6.1 <br />Agenda Section <br />rsleptember eeting Date <br />Prepared by <br />Discussion Items <br />11, 2013 <br />Chris Leeseberg, Park Planner - Planner <br />Item Description <br />Reviewed by <br />Discussion of the Baldwin Park Playground <br />Michael Hecker, Parks and Recreation Director <br />$48,200 <br />Reviewed by <br />Action Requested <br />No action is being requested. Staff will present estimated costs of a various park components. <br />Background /Discussion <br />At the August 14, 2013 Parks and Recreation Commission meeting, a resident representing several of the <br />area apartments shared his concern over the removal of the playground and the squeaky swings at <br />Baldwin Park. The resident presented a plan they would like to see implemented at the park. <br />There are six apartment buildings in the area and the children miss the park and would like to see the <br />space made into a useable space again, not an empty lot. <br />Financial Impact <br />Below are estimates to show what the costs would be to provide the items the resident's desire. To <br />include all items on the plan presented, the estimated costs would be $47,900 - $55,700 depending on <br />what playground equipment is utilized. This estimate does not include contingency, administration, <br />engineering, seeding etc. <br />Basics <br />Gazebo $15,000 <br />Picnic Area x4 $ 4,000 <br />Swings $ 2,700 <br />Concrete Curb $ 4,500 <br />$26,200 <br />Ootions w /basics w /basics &trail <br />Playground A +chips <br />$12,200 <br />$38,400 <br />$ 47,900 <br />Playground B +chips <br />$19,300 <br />$45,500 <br />$ 55,000 <br />Palyground C +chips <br />$50,000 <br />$76,200 <br />$ 85,700 <br />1/2 Basketball Ct <br />$22,000 <br />$48,200 <br />$ 57,700 <br />Sand (V -ball) <br />$20,000 <br />$46,200 <br />1 $ 55,700 <br />10 -Trail 1 $ 9,500 <br />rvATUR <br />