My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 09-10-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
09-10-2013
>
4.2. ERMUSR 09-10-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 10:28:56 AM
Creation date
9/12/2013 10:28:39 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River —. <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Wade Lovelette—Superintendent of Technical <br /> John Dietz—Chair Services <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 10, 2013 4.2 <br /> SUBJECT: <br /> North Substation Upgrade Update <br /> DISCUSSION: <br /> The preliminary work for the upgrade at the North Substation has begun. Granite City Construction has <br /> started the excavation work for widening the driveway to the substation and expanding the parking area. <br /> A temporary fence had to be put in place for the landowner's cattle until the dirt work was complete. <br /> After that was completed, the permanent fence was put back up and a new gate was installed for him. <br /> We have five substation meters inside the meter building that have to be moved to an outside wall. Our <br /> meter technicians took care of this project on August 28th. <br /> We are scheduled to switch out the North Substation on September 24th,remove the 10.5 MVA <br /> transformer on September 25th and install the new substation transformer on September 26th. We are <br /> planning for a two week outage on that substation to get everything wired and installed. The North <br /> Substation should be back online by October 8th. <br /> I have a slide show of some preliminary photos of how the substation looks before the upgrade takes <br /> place. We will show this during the meeting. <br /> -' POWERED II <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider POWERED To SERVE <br /> 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.