My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 PCSR 07-09-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
07-09-2013
>
4.2 PCSR 07-09-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2013 9:51:52 AM
Creation date
7/5/2013 9:51:14 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk REQUEST FOR ACTION <br /> River <br /> TO ITEM NUMBER <br /> Planning Commission 4.2 <br /> AGENDA SECTION MEETING DATE PREPARED BY <br /> Planning Items July 9, 2013 Zachary Carlton,Planning Intern <br /> ITEM DESCRIPTION REVIEWED By <br /> Request by Preferred Powder Coating for Conditional Use Jeremy Barnhart,Deputy Director, <br /> Permit, 10846 170th Ct. NW CODD <br /> Case No. CU 13-08 REVIEWED BY <br /> Chris Leeseberg,Park Planner-Planner <br /> ACTION REQUESTED <br /> Staff recommends approval of the Conditional Use Permit with the following conditions: <br /> 1. Vegetative screening planted as indicated in attached landscape plan. <br /> 2. Plantings identified on the landscaping plan dated May 15,2013 shall be maintained and <br /> replaced as necessary. <br /> 3. As a Conditional Use Permit is not a Building Permit,the applicant shall apply for all required <br /> permits. <br /> 4. Sampling manhole as required by utilities. <br /> 5. Parking lot islands as described. <br /> 6. The overhead doors are of similar color to the building façade. <br /> BACKGROUND/DISCUSSION <br /> The applicant is requesting a Conditional Use Permit to face the overhead doors of a new facility towards <br /> a front lot line. The business, a powder coating company,requires overhead doors to receive deliveries <br /> and move large objects and material into and out of the facility. The lot is a corner lot with frontage on <br /> Twin Lakes Road and 170th Lane. Being a corner lot,Preferred Powder is restricted from placing <br /> overhead doors along two street frontages. <br /> The buildable area of the 10.36 acre site is constricted by a utility easement running through the center of <br /> the property and a wetland located along the south property line. The existing encroachment agreement <br /> between the City of Elk River and the utility company prohibits construction within the easement. The <br /> proposed facility will impact existing wetlands,but the impacts will be mitigated on site and through the <br /> purchase of wetland credits. <br /> The 100,000 square foot facility has been placed on the parcel in order to meet established setbacks, and <br /> reduce impacts to the existing wetland. Due to the challenging site and the operational layout of the <br /> facility the overhead doors required for use are facing one of the front lot lines. <br /> Access <br /> There are two accesses to the site,both off of 170th Lane. A drive will encircle the building, connecting <br /> the access for interior mobility, and provide for fire department needs. <br /> P»OWEREO Ot <br />
The URL can be used to link to this page
Your browser does not support the video tag.