My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. ICESR 04-09-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2013
>
04-09-2013
>
7.2. ICESR 04-09-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 2:53:42 PM
Creation date
4/17/2013 2:53:37 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk REQUEST FOR ACTION <br /> River <br /> To 1 ITEM NUMBER <br /> Arena Commission 7.2 <br /> AGENDA SECTION MEETING DATE PREPARED BY <br /> Action Item April 9, 2013 Rich Czech <br /> ITEM DESCRIPTION REVIEWED By <br /> Olympic Ice Plant / Arena Renovation Cal Portner <br /> REVIEWED BY <br /> ACTION REQUESTED <br /> Provide direction <br /> BACKGROUND/DISCUSSION <br /> The need to make the necessary repairs to the ice plants is reaching a critical state. We have found a <br /> refrigeration leak in the Olympic Arena ice plant,which will require replacing at least 1,000 pounds of R- <br /> 22 Refrigerant this spring. <br /> The valve on the bucket trap is rusted to the point where it will have to be replaced. Unfortunately, the <br /> valve cannot be isolated so the refrigeration must be removed which will require hiring a contractor. <br /> The valve regulates system pressure to divert heat from passing through the cooling tower, to a heat <br /> reclaimer to the snow melt pit and the sub floor in below the ice surface. The system is operable without <br /> the valve, however not as efficient and adds more costs to arena operations. This is the second time that <br /> the valve has broken. <br /> Further, the ice plant is insulated to prevent condensation and corrosion from warm air. The insulation is <br /> old, drying out, and falling off. Insulation replacement was in the 2007 CIP at an estimated cost of <br /> $27,000. It was removed because it was expected the system would be replaced. <br /> The Olympic ice plant holds 6,000-6,500 pounds of R-22. R-22 costs $18 to $20 per pound, 50% more <br /> than last year. A major leak would cost a minimum of$108,000. With the increasing limited availability <br /> of R22, it is possible that we wouldn't be able to find enough refrigeration to fully charge the system. <br /> The city does have insurance to cover lost revenue in case the arena is closed down for an extended <br /> period of time. <br /> The increasing number of problems we have experienced this year indicates that the system is in dire <br /> need of replacement, especially with the upcoming phase out of R22 being less than 10 years. <br /> Unfortunately the renovation or the replacement of the Arena has yet to be determined; however the plan <br /> to replace the refrigeration system needs to be planned for the immediate future. <br /> We are not alone in this situation, there are many arenas that have replaced or in the process of replacing <br /> their refrigeration systems, including Parade Stadium, Chaska, Mankato, Eden Prairie, New Hope, <br /> Brooklyn Park, Fogerty (Blaine), UMD, and Gustavus Adolphus. There is draft legislation under the <br /> Mighty Ducks framework that proposes to appropriate $5 million in matching grants for air quality <br /> IP 0 II E R E a al <br /> C:\Users\rczcch\Desktop\ARENAMGR\Arena Commission\2013\April Commission Packet\(8) Action Requested NATURE <br /> Olympic Ice Plant Arena Renovation.docx RF` <br />
The URL can be used to link to this page
Your browser does not support the video tag.