My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. HPCSR 09-20-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Heritage Preservation Commission
>
HPC Packets
>
2012
>
09-20-2012
>
4.2. HPCSR 09-20-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:29:40 AM
Creation date
9/19/2012 11:29:40 AM
Metadata
Fields
Template:
City Government
type
HPSR
date
9/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2- <br /> r1 � > <br /> PROPOSAL <br /> TMI TMI Coatings, Inc. <br /> COATINGS 3291 Terminal Drive,St. Paul,Minnesota 55121-1610 Phone: 651-452.6100 Fax: 651-452-0598 <br /> Painting & Restoration Contractors <br /> City of Elk River NOTE: This proposal may be withdrawn by us if not <br /> Attn: Rachel King accepted within 30 days. <br /> 13065 Orono Parkway <br /> Elk River,MN 55330 Date: August 28,2012 <br /> Phone 763-635-1072/Fax 763-635-1090 Regarding: Water Tower Restoration <br /> E-mail RKing@ElkRiverMN.gov <br /> 100,000 Gallon Water Tank 129' High <br /> NW Corner of Jackson Avenue NW and 4th Street NW <br /> TMI Coatings is certified as a woman owned business, so every dollar spent with TMI counts toward your <br /> diversity spending goals. <br /> TMI Coatings, Inc. has reviewed your request for the Elk River Water Tower Restoration Project,and proposes the <br /> following scope of work: <br /> 1. TMI to remove all existing coatings on the tank exterior by sandblasting to SSPC-SP6 Commercial Blast. TMI <br /> to erect a full containment for blasting and recoating the water tower to prevent dust and overspray. <br /> 2. TMI to prime all exterior surfaces with a corrosion resistant primer. <br /> 3. TMI to apply a finish coat to match the original paint colors. <br /> o Tank, riser, lattice posts,ladder and cage,catwalk,railing and all structural steel to be a metallic <br /> aluminum finish. <br /> o Cone roof of the water tank to receive an acrylic polymer,red in color, for long term protection. <br /> o Tank to receive black lettering on the side. <br /> YOUR BUDGET COST INCLUDING LABOR AND MATERIALS INSTALLED $210,000 <br /> NOTE: Bid is based on one job mobilization/demobilization. <br /> Thank you for the opportunity to submit this proposal to you. You can check out our company history and other <br /> coating services at our website at www.tmicoatings.com. Visit TMI Coatings' blog at www.tmicoatingsblog.net to <br /> learn about problems we have solved for customers like you or become a fan of TMI Coatings on Facebook. If <br /> you have any questions about our bid,please call me at 651-452-6100. <br /> If e-mail is an effective communication tool for you, feel free to contact me at picick{ tmicoatings.com with <br /> any questions or comments regarding this proposal. <br /> as:tmip/ellcrivero2(mjw) <br /> — — — ACCI DTTTDhICG- <br />
The URL can be used to link to this page
Your browser does not support the video tag.