My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13.3. PRSR 09-12-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2012
>
09-12-2012
>
13.3. PRSR 09-12-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2012 9:35:03 AM
Creation date
9/11/2012 9:35:03 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
9/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Workshop Item: 13.3 <br /> City or <br /> Elk MEMORANDUM <br /> River <br /> TO: Parks and Recreation Commission <br /> FROM: Chris Leeseberg, Park Planner-Planner <br /> DATE: September 12, 2012 <br /> SUBJECT: Taylor Hecker Eagle Scout Project <br /> Eagle Scout Taylor Hecker will be in attendance to introduce his potential Eagle Scout <br /> project and will be looking for direction from the Parks and Recreation Commission to <br /> include in his project write-up. <br /> He is interested in designing and building a gateway/monument sign at the entrance to the <br /> Great Northern Trail. <br /> Mr. Hecker has met with staff and two commissioners to brain storm ideas and sign <br /> locations. <br /> The Great Northern Trail is expected to be a regional trail system with end points in Elk <br /> River and Princeton (or beyond). The significance of the gateway/sign is that it could <br /> possibly determine the design palette for the entire trial systems signage. <br /> SWIM II <br /> N\Depatt d6 ments\Pa and Recreation\Recreazion\2012 PRC Packets\9-12-12 PRC Packet\WS Item 13.3 Eagle Scout <br /> Mema.doc ISA/URLI <br />
The URL can be used to link to this page
Your browser does not support the video tag.