My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION 3 08-13-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2012
>
08-13-2012
>
INFORMATION 3 08-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2012 1:29:54 PM
Creation date
8/8/2012 1:29:54 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
8/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION <br /> City of <br /> Elk MEMORANDUM <br /> River <br /> TO: Annie Deckert,Director <br /> FROM: Justin Femrite, P.E., City Engineer <br /> DATE: 7-16-2012 <br /> SUBJECT: Main Street Parking Plaza Changes <br /> Below is a summary of the changes that were incorporated during the construction of the Main <br /> Street parking plaza. <br /> 1) Additional Downspout Connection-$910.00 <br /> The plans called for the installation of 5 catch basins to be located under the <br /> building downspouts. There were a total of 6 downspouts that needed to have a <br /> catch basin installed. Staff approved a change of$910 to add one additional catch <br /> basin. <br /> 2) Upgrade Irrigation Controls-$155.98 <br /> Parks Staff requested we install a more advanced controller than what was <br /> specified. This controller will provide the parks maintenance staff to better <br /> control the irrigation system. <br /> 3) Paver Repair along Main Street- $430.00 <br /> There was additional existing pavers that needed to be reset along Main <br /> Street due to the removal of the front foundation wall from the old buildings. <br /> These pavers and foundations were left in place last winter so the walk would <br /> not have been out of service for a lengthy time period. <br /> 4) Stairwell work at the Antiques Building- $1,250.00 <br /> This was an anticipated change during the design of the project. It was not <br /> until we removed the concrete from the area that we were able to determine <br /> exactly what needed to be completed. The old basement entrance was filled <br /> in with block and then backfilled with sand. <br /> C:\Users\adeckert\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\90Y59UE4\Project Changes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.