My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. SR 04-20-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
04/20/1998
>
6.5. SR 04-20-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:09 AM
Creation date
9/30/2003 3:06:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/20/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y of <br /> <br />ITEM ~ 6.5. <br /> <br />Memorandum <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />MAYOR AND CITY COUNCIL <br /> <br />STEPHEN ROHLF, BUILDING <br />& ZONING ADMINISTRATOR <br /> <br />APRIL 20, 1998 ~ <br /> <br />SUBJECT: <br /> <br />MINERAL EXCAVATION BY <br />CAMAS MINNESOTA, INC. <br />CU 98-5 <br /> <br />Request <br /> <br />CAMAS Minnesota, Inc. (Shiely Company) is requesting a conditional use permit for <br />mineral excavation to mine sand and gravel from a 5.85 acre site in Section 10, Township <br />33, Range 26, Sherbume County, Minnesota. A complete legal description and vicinity <br />map is included in CAMAS' application attached to this memo. The property in question <br />is zoned ME - Mineral Excavation Overlay District and the underlying zoning is A- <br />l/Agricultual. <br /> <br />The property is proposed to be mined to an average depth of 15 feet over an estimated <br />five years period. The phasing plan in the attached application shows the mining <br />proceeding from south to north, however, the operator may start the mine in the north. <br />The city's normal hours of operation for mineral excavation (7:00 a.m. to 7:00 p.m.) are <br />proposed. Screening and crashing the product is also proposed on the site, but no <br />washing operation. <br /> <br />Elk River Bituminous will be doing the actual mining as a subcontractor to CAMAS. <br />The product mined will be used in Elk River Bituminous' hot mix plant located on a <br />parcel adjacent to the mining. CAMAS is the owner of the mine site. <br /> <br />Review <br /> <br />Wetlands - The proposed fifty foot buffer from the mining activities to the wetlands <br />on the property should suffice to ensure the wetlands are not affected. As indicated in <br />CAMAS' attached application, the exact boundaries of the wetlands need to be <br />delineated, when weather permits. The contours on the Final Topography included in <br />the application show mn-off from the mining area being directed toward a ponding <br />area in a previous excavation. This drainage plan should not deprive the natural <br />ponds of water to a point that it will affect their water levels. Ground water in the <br />location of the proposal is estimated to be at a depth of 940 to 945 feet above mean <br />sea level, which is far below the proposed mining limits. <br /> <br /> s:\b&z\stever\camascup.doc <br /> <br />13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.