Laserfiche WebLink
ITEM 5.2. <br /> <br />Howard R, Green Qompany <br />QONSULTING ENGINEERS <br /> <br />April 9, 1998 <br />File: 230321J-0564 <br /> <br />~N~ULTING ENGINI~ <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330-0490 <br /> <br />RE: BUSINESS CENTER DRIVE IMPROVEMENTS <br /> <br />Dear Mayor and Council Members: <br /> <br />We have opened and tabulated the bids received on Thursday, April 2, 1998, for the Business <br />Center Drive Street and Utility improvements. There were a total of eleven bids received. The <br />following list provides the bidders and their total bid: <br /> <br />Richard Knutson, Inc. <br />Latour Construction, Inc. <br />W. B. Miller, Inc. <br />Bonine Excavating, Inc. <br />Arcon Construction Company, Inc. <br />Northdale Construction, Inc. <br />Randy Kramer Excavating, Inc. <br />Annandale Contracting, Inc. <br />Brown & Cris, Inc. <br />Barbarossa & Sons <br />R. L. Larson Excavating <br /> <br />$389,571.15 <br /> 406,962.38 <br /> 410,251.65 <br /> 417,179.95 <br /> 422,436.95 <br /> 425,780.81 <br /> 432,288.89 <br /> 443,226.70 <br /> 453,023.20 <br /> 477,233.95 <br /> 783,631.15 <br /> <br />The bids were very competitive and the Iow bid is slightly below the feasibility study estimate. <br />The next step the Council needs to take in progressing with this project is to hold the <br />assessment hearing. As the City Council is aware, there are two properties to be assessed-- <br />the Sherburne County Government Center and the Gagne property. Attached is a resolution for <br />the City Council's consideration which determines the cost to be assessed and orders the <br />preparation of the assessment roll. At this point in time, the resolution indicates the same <br />assessment amount that was indicated in the feasibility study. This is because the land <br />acquisition with the Gagne property has not been concluded at this time. The City may end up <br />purchasing the right-of-way from Mr. Gagne and then assessing the cost back to him. The <br />assessment hearing would be scheduled for Monday, May 4, 1998. <br /> <br />O:\PROJ\230321J\321-0901 .apr.doc <br /> 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 888/368-4389 <br /> <br /> <br />