My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3.A. SR 04-16-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
04-16-2012
>
6.3.A. SR 04-16-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 9:33:21 AM
Creation date
4/13/2012 9:32:42 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Mayor and City Council 6.3.A. <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Awards/Recognitions April 16, 2012 Michael Hecker, Parks and Recreation <br /> Director <br />ITEM DESCRIPTION REVIEWED BY <br />Resolution Acknowledging Contribution of Funding fora Tina Allard, Ci Clerk <br />Basketball Court from Trout Brook Farms Homeowners REVIEWED BY <br />Association Cal Portner, Ci Administrator <br />ACTION REQUESTED <br />Adopt the attached resolution acknowledging the $61,341 monetary donation from the Trout Brook <br />Farms Homeowners Association pursuant to Minnesota State Statute X465.03. Statute requires that <br />resolutions for donations are adopted by a 2/3 majority vote. <br />BACKGROUND/DISCUSSION <br />For the past two years, the Trout Brook Farms Homeowners Association has been discussing <br />improvements with monetary donations that they would like to make to the Trott Brook Farms Park. On <br />February 9, the Homeowners Association President, Sean Theisen, met with Rodney Schreifels and <br />Michael Hecker to discuss the possibility of installing afull-size basketball court. <br />After some discussion at the park site between city staff and the association board, it was decided to get <br />estimates for a full size 60'X94' basketball court, with two basketball standards, green surface with white <br />lines painted for a full size court, hopscotch, and foursquare. There was also discussion to get quotes for <br />lighting, fencing, and a drinking fountain. <br />Parks Supervisor Rodney Schreifels received. three quotes from proven contractors: Court Surfaces and <br />Repair Inc., Surface Pro, and Upper Midwest Athletic Construction. All three quotes where given the <br />exact same requirements. These quotes include the contractor doing all work, which is complete <br />excavation of existing clay soil, proper sub base and drainage, asphalt, green surface with lines, 125' of <br />black fencing, and installing the basketball standards. The quotes came in as follows: <br />Court Surfaces and Repair Inc. - $41,491.00 <br />Surface Pro - $47,447.00 <br />Upper Midwest Athletic Construction - $46,303.00 <br />These quotes include the $6,346 cost of installing two high quality Bison basketball standards. <br />Rodney obtained two quotes for lighting the basketball court from two local Elk River electrical <br />contractors: <br />Hipsag Electric - $16,650.00 includes six light fixtures <br />Rike-Lee Electric - $16,525.00 includes four light fixtures <br />PerEwE® er <br />NA~'UI~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.