Laserfiche WebLink
Cry of <br />Elk --- <br />River <br />REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Parks and Recreation Commission 8.3 <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Action Item April 11, 2012 Michael Hecker, Parks and Recreation <br /> Director <br />ITEM DESCRIPTION REVIEWED By <br />Monetary Donations from the Trott Brook Farms Homeowners Cal Portrrer, Ci Administrator <br />Association for improvements to construct a basketball court. REVIEWED Br <br />ACTION REQUESTED <br />Staff recommends the Parks and Recreation Commission support the improvements and monetary <br />donations from the Trott Brook Fam3s Homeowners Association for a basketball court, court lighting <br />and a drinking fountain at Trott Brook Farms Park. <br />BACKGROUND/DISCUSSION <br />The past two years the Trout Brook Farms Home Association has been discussing improvements with <br />monetary donations that they would like to make to the Trott Brook Farms Park. The discussion has <br />included trails, athletic fields, hockey rinks and a basketball court. Ckr February 9`h the Homeowners <br />Association President, Sean Theisen, met with Rodney Schreifels and Michael Hecker to discuss the <br />possibility of installing afull-size basketball coact. The Homeowners Board is a total of five members. <br />The discussion lead to on site meeting about a week later at Trott Brook Farms Park for logistics. It was <br />decided to get estimates for a full size 60'X94' basketball court, with two basketball standards, green <br />surface with white lines painted for a full size court, hopscotch, and forusquare. There was also <br />discussion to get quotes for lighting, fencing, and a drinking fountain. <br />Rodney received three quotes from proven contractors, Court Surfaces and Repair Inc: Ham Lake, MIV, <br />Surface Pro-St. Francis, MN, and Upper Midwest Athletic Construction-Anoka, MN. All three quotes <br />where given the exact same requirements. Upper Midwest Athletic Construction did not submit a <br />complete updated quote. These quotes include the contractor doing all work, which is complete <br />excavation of existing clay soil, proper sub base and drainage, asphalt, green surface with lines, 125' of <br />black fencing, and installing the basketball standards. <br />Court Surfaces and Repair Inc. from Ham Lake, MN <br />$41,491.00 <br />Surface Pro from St. Francis, MN <br />$48,626.00 <br />These quotes include the $6,346 cost of installing two high qualityBison basketball standards. We found <br />that the City can purchase the standards at a lower price than the contractors. <br />PrrRwEREI Bt <br />N:\Depattmenis\Pads and Recreation\Recreazion\2012 PRC Pazkets\411-12 PRC Packet\8.3 Trott Bmok Fame I`~IA1'URE <br />donaziondocx <br />