Laserfiche WebLink
MEMORANDUM <br />TO: Ice Arena Commission, Members <br />FROM: Rich Czech, Arena Manager <br />DATE: March 9`", 2012 <br />SUBJECT: Agenda Memo -March 13`"' 2012 <br />4. Ice Arena Renovation Update <br />Attached for your review are proposals for engineering study's for the Barn side of the <br />Arena. The first proposal is from the 292 group for the cost of $4,500.00. Their <br />proposal includes the work of two other companies, Stevens Engineering, which <br />would assess the current ice plant equipment, and Nelson Rudie Associates, which <br />would assess the structure of the barn, condition of the roof and the status of the <br />HVAC systems. <br />The other proposals are from Stevens Engineers that would be the advisers on the Ice <br />plant, Hallberg Engineering, which would be the advisors for the HVAC systems, <br />which would include Dehumidification, and Skyline Building Envelope Consultants <br />(SBEC) that would be the advisors of the building and the roof. <br />The main reason for these proposals; <br />1) Identify the problem areas of the Barn's roof that leaks when it rains. <br />2) Review the integrity of the structure of the Barn <br />3) Identify possible problems with current dehumidification, HVAC systems, and Ice <br />plants. <br />4) Recommend improvements outlining costs and the longevity of improvements. <br />SBEC's proposal included water testing for the Barn's roof while the 292's proposal did <br />not. The water testing pinpoints the leaks and would allow closer inspect of these areas. <br />The 292 group provided a proposal for water testing from Roof Spec Inc. Attached is <br />their proposal. <br />When SBEC was here performing their initial inspection of the Barn, I indicated to them <br />that we sometimes had issues with the Olympic rink leaking when it rain. After reviewing <br />the Olympic building they noticed hairline fractures in the precast on the Olympic rink <br />and possible problems to the roof for the Olympic looker rooms. In their opinion testing <br />should be done to the precast to determine if water seeps through the cracks during rain. <br />They also recommend that an inspection of the locker rooms roof should be performed to <br />record defects in the roof and note weaz and possible troubled azeasrepairs. Attached for <br />your review is their proposal to perform a study on the Olympic rink. <br />