My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 03-20-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2012
>
03-20-2012
>
4.2. ERMUSR 03-20-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2012 4:08:32 PM
Creation date
3/16/2012 4:08:32 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ElkRiver ---~ <br />Municipal Utiliries <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />www,elkriverutilities. com <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director <br />John Dietz -Chair <br />Dazyl Thompson -Vice Chair <br />Al Nadeau -Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Mazch 20, 2012 4.2 <br /> <br />SUBJECT: <br />U date on Buildin Signage <br />BACKGROUND: <br />In late 2011, the Commission asked staff to research restrictions and regulations for Signage on <br />the Power Plant. The only restriction would be size. The Signage would be limited to 96 squaze <br />feet. Staff has talked with two different local sign companies. At the February meeting the <br />Commission approved proceeding with the lowest quote. <br />DISCUSSION: <br />There has been further staff discussion on the proposed Signage. Originally, staff had proposed <br />two separate building signs. There are some issues with the implementation of this and staff <br />believes that only one building sign is needed. Secondly, there were some differences in the <br />quotes that needed to be addressed. <br />Staff will provide additional information at the time of the Commission meeting. <br />ACTION REQUESTED: <br />Staff will make a recommendation to the Commission at the time of the meeting. <br />POWERfR Rr <br />1 YA~V~~ <br />POWERED TO SEM1VE <br />
The URL can be used to link to this page
Your browser does not support the video tag.