Laserfiche WebLink
Elk River: <br />Municipal U <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />www. elkriverutili Gies. com <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director <br />John Dietz -Chair <br />Daryl Thompson -Vice Chair <br />Al Nadeau -Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Mazch 20, 2012 3.4 <br />SUBJECT: <br />Dis ersed Generation Tariff Documentation Chan es <br />BACKGROUND: <br />Elk River Municipal Utilities offers a Dispersed Generation (On-Site Generator) / Interruptible <br />Load Program. This program works in conjunction with Great River Energy's demand side load <br />management member service program. <br />DISCUSSION: <br />It has been determined by staff that our program tariff documentation needed to be revised to <br />included language defming how incurred fuel costs are addressed. This language already exists <br />in the program documentation but needs to be part of the Commission approved tariff document <br />as well. Attached is the revised tariff reflecting the procedure to address incurred fuel costs. <br />This is only a documentation change and is not a change in the program, costs, or participant <br />credit. <br />ACTION REQUESTED: <br />Staff recommends approval of the revised Dispersed Generation (On-Site Generator) / <br />Interruptible Load Program taziff sheet. <br />ATTACHMENTS: <br />• Proposed 2012 Dispersed Generation / Interruptible Load Program Tariff <br />s <br />PONwwERER BI' <br />~A~~~~ <br />POWFREO TO SF0.VE <br />