My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 PCSR 03-13-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
03-13-2012
>
4.3 PCSR 03-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 9:44:39 AM
Creation date
3/9/2012 9:17:35 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk REQUEST FOR ACTION <br />~_ <br />River <br />TO ITEM NUMBER <br />Plannin Commission 4.3 <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Planning Items March 13, 2012 Jeremy Barnhart, Planning Manager <br />ITEM DESCRIPTION REVIEWED By <br />Request by Elk River Lutheran Church for Conditional Use erem Barnhart, Plannin Mana er <br />Permit for church (Institutional Use) at 729 Main Street (former REVIEWED BY <br />15Y National Bank), Case No. CU 12-03 -Public hearing <br />ACTION REQUESTED <br />Staff recommends. that approval of the Conditional Use Permit request, as illustrated on drawings dated <br />received March 5, 2012, and in comment response letter dated March 5, with the following conditions: <br />1. A variance is obtained from the Shore land regulations. <br />2. As a Conditional Use Permit is not a Building Permit, the applicant shall apply for all <br />require permits. <br />3. The development shall meet all applicable fire codes. <br />4. All signage must receive a permit prior to construction and installation. <br />5. A 12 foot easement for trail purposes shall be provided immediately south of the existing <br />curb line on the south side of the site. <br />Applicant Vanman Architects and Builders, on behalf of Elk River Lutheran <br />Church and the ELCA <br />Address 729 Main Street <br />60 Day Rule The City must take action by March 30, 2012 <br />OVERVIEW <br />The applicant is requesting Conditional Use Permit approval to operate an institutional use in the <br />Downtown District (DD) zoning district. <br />BACKGROUND/PRECEDENT <br />Churches are classified as an institutional use in the Elk River Zoning Code; institutional uses are a <br />conditional use in most Elk River Zoning districts, including the Downtown District. <br />Elk River Lutheran Church formed in 2010 and they moved into a temporary space in Northbound <br />Crossing late that year. They received an interim use permit for that location, which is to expire in <br />December 2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.