My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. SR 02-09-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
02/09/1998 - SPECIAL
>
4.1. SR 02-09-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:05 AM
Creation date
9/22/2003 8:39:45 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/9/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~,~y of <br /> <br />ITEM 4.1. <br /> <br />MEMORANDUM <br /> <br />iver <br /> FROM: <br /> <br />MAYOR AND CITY COUNCIL <br /> <br />STEPHEN ROHLF, BUILDING <br />ZONING ADMINISTRATOR <br /> <br />DATE: FEBRUARY 9, 1998 <br /> <br />SUBJECT: LAKE ORONO PROJECT <br /> <br />Staff is proposing the assessable area for the Lake Orono project includes the shoreland <br />from the dam as for up river as sediment is removed. The assessment role still needs <br />adjustment, but the area described includes property under approximately 117 different <br />ownerships that equal 201 equivalency units. <br /> <br />The vast majority of the owners (102) are proposed to be assessed as one unit. The <br />breakdown of units per owner is as follows: <br /> <br />Owners # of units <br /> <br />102 ~ 1 <br />7 @ 2 <br />6 (between 4 & 10 units each) 39 <br />1 ~., 20 <br />1 ~ 26 <br /> <br />117 201 <br /> <br />Guardian Angels is proposed at 20 equivalency units and the city is the owner with 26. <br />Included in this packet is a memo from Pat Klaers with a recommendation on how the <br />city's units should be treated. <br /> <br />The numbers above are preliminary. It is estimated that approximately 20 of the 201 <br />equivalency units need to be reviewed closer. <br /> <br />The estimated cost of the recommended project is $750,000. Overhead was figured into <br />this price at 28%, the same as an urban service project. The plans required for this project <br />will not need to be as detailed as an urban service project and it will require less survey <br />stacking and inspection. <br /> <br />The 28% was used to add a cushion. The bids for the project may come in higher than <br />the estimates the city received. If the overhead is less than what was estimated, the city <br />contribution will be less. <br /> <br />13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.