My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 01-10-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2012
>
01-10-2012
>
4.1. ERMUSR 01-10-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 3:37:13 PM
Creation date
1/6/2012 3:37:13 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River: <br />Municipal U <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 5 5 3 30-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />www. elkriverutilities. com <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director <br />John Dietz -Chair <br />Daryl Thompson- Vice Chair <br />Al Nadeau -Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Jan 10, 2012 4.1 <br />SUBJECT: <br />Power Su ply O lions /Resource Planning U date <br />BACKGROUND: <br />In September 2008, Connexus Energy terminated the 10-year rolling "all requirements" power <br />contract with Elk River Municipal Utilities. In Apri12010, the Utilities Commission authorized <br />entering into "Phase 1" of a resource planning study with a coalition which includes Central <br />Minnesota Municipal Power Agency (CMMPA) as a participant. In September 2010, the <br />Utilities Commission authorized entering into "Phase 2" of a resource planning study which <br />includes the release of a Request For Proposal (RFP). The RFP was issued on November 15, <br />2010. In May 2011, the Utilities Commission authorized entering into "Phase 2b" of the <br />resource planning study which will include risk assessment of the proposals. In addition to <br />working with the Resource Planning Coalition, staff continues to explore other power supply <br />options. <br />DISCUSSION: <br />Representatives for Minnesota Municipal Power Agency (MMPA) are in attendance to discuss <br />their agency. <br />ACTION REQUESTED: <br />No action required. <br />s <br />rowEeEO er <br />~A~uR~ <br />POWERED TO SERVE <br />
The URL can be used to link to this page
Your browser does not support the video tag.