My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-13-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
12-13-2011
>
4.1. ERMUSR 12-13-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2011 9:34:46 AM
Creation date
12/15/2011 9:34:46 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River; <br />Municipal U <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />s <br />UTILITIES COMMISSION MEETING <br />PBNEBEB B1 <br />~~~~~~ <br />P ~ w c P F D T O S E R V E <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director <br />John Dietz -Chair <br />Daryl Thompson -Vice Chair <br />AI Nadeau -Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />December 13, 2011 4.1 <br />SUBJECT: <br />Power Su ly O tions /Resource Plannin U date <br />BACKGROUND: <br />In September 2008, Connexus Energy terminated the 10-year rolling "all requirements" power <br />contract with Elk River Municipal Utilities. In Apri12010, the Utilities Commission authorized <br />entering into "Phase 1" of a resource planning study with a coalition which includes Central <br />Minnesota Municipal Power Agency (CMMPA) as a participant. In September 2010, the <br />Utilities Commission authorized entering into "Phase 2" of a resource planning study which <br />includes the release of a Request For Proposal (RFP). The RFP was issued on November 15, <br />2010. In May 2011, the Utilities Commission authorized entering into "Phase 2b" of the <br />resource planning study which will include risk assessment of the proposals. In addition to <br />working with the Resource Planning Coalition, staff continues to explore other power supply <br />options. <br />DISCUSSION: <br />The RFP analysis has been completed by CMMPA as well as the building of participant specific <br />resource portfolios. Representatives from CMMPA are in attendance to present Resource <br />Planning Coalition information to the Utilities Commission for consideration. Also, information <br />on an opportunity to participate in an upcoming transmission study will be presented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.