My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. ERMUSR 09-13-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
09-13-2011
>
4.3. ERMUSR 09-13-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2011 9:39:13 AM
Creation date
9/12/2011 9:39:13 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~.3 <br />Elk River~~ <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 7(3.441.2020 <br />Fax: 763.441.8099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director <br />John Dietz -Chair <br />Daryl Thompson -Vice Chair <br />Al Nadeau -Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Se tember 13, 2011 4.3 <br />SUBJECT: <br />Power Suppl Options /Resource Planning Update <br />BACKGROUND: <br />In September 2008, Connexus Energy terminated the 10-year rolling "all requirements" power contract <br />with Elk River Municipal Utilities. In April 2010, the Utilities Commission authorized entering into <br />"Phase I" of a resource planning study with a coalition which includes Central Minnesota Municipal <br />Power Agency (CMMPA) as a participant. In September 2010, the Utilities Commission authorized <br />entering into "Phase 2" of a resource planning study which includes the release of a Request For Proposal <br />(RFP). The RFP was issued on November 15, 2010. In May 2011, the Utilities Commission authorized <br />entering into "Phase 2b" of the resource planning study which will include risk assessment ofthe <br />proposals. <br />DISCUSSION: <br />On July 1 s`, Commissioner Al Nadeau and I participated in a conference call with CMMPA to go over the <br />Resource Planning Coalition and RFP process to date. On September 8`h, Commissioner AI Nadeau and <br />Wade Lovelette attended a preliminary presentation of bid results at the CMMPA office in Blue Earth, <br />MN. A verbal update will be given at the Commission meeting. A presentation to the Commission is <br />tentatively scheduled for this fall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.