My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 08-09-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
08-09-2011
>
6.1. ERMUSR 08-09-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2011 3:10:47 PM
Creation date
8/5/2011 4:15:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~~1 <br />Elk River <br />Municipal U <br />ties <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director <br />John Dietz -Chair <br />Daryl Thompson -Vice Chair <br />AI Nadeau -Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Au ust 9, 2011 6.1 <br />SUBJECT: <br />Staff U dates -Utilities Director <br />DISCUSSION: <br />The storms that rolled through Minnesota on August 1 sc caused damage to Great River Energy <br />(GRE) transmission poles on the DC line which delivers electricity to Minnesota from their Coal <br />Creek Station power plant located in Underwood, North Dakota. Coal Creek Station is GRE's <br />lazgest generation facility. Because this DC transmission line is out of service, GRE is unable to <br />run Coal Creek Station at full output. This has caused GRE to purchase power on the market <br />while the transmission line is repaired. The transmission structures that have been damaged will <br />be temporazily repaired with wood structures to expedite service being restored. This may be <br />complete as soon as August 4a'. The steel structures will then be repaired or replaced as time and <br />materials permit. <br />Attached is a memo regarding the branding and mazketing project being conducted by the Elk <br />River Economic Development Authority from Annie Deckert, Director of Economic <br />Development for the City of Elk River. Michelle Martindale, Credit 8c Collections Specialist for <br />ERMU, is one of 13 branding and mazketing subcommittee members contributing to the project. <br />The final results from the project will be presented at a City Council and EDA joint meeting on <br />September 12, 2011. <br />The 2011 Elk River Community Profile is attached for your use. <br />Also attached for Commission review is a 2011 Mirmesota utility rate survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.