My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-14-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
06-14-2011
>
4.2. ERMUSR 06-14-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:45:34 AM
Creation date
6/15/2011 9:45:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River ---~ <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />L~lk River, MN 5 5 3 30-043 0 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Troy Adams, P.E. -Director of Operations <br />John Dietz, Chair <br />Daryl Thompson, Vice Chair <br />Al Nadeau, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />June 14, 2011 4.2 <br />SUBJECT: <br />Power Su 1 Options /Resource Plannin Update <br />BACKGROUND: <br />In September 2008, Connexus Energy terminated the 10-year rolling "all requirements" power contract <br />with Elk River Municipal Utilities. In April 2010, the Utilities Commission authorized entering into <br />"Phase 1" of a resource planning study with a coalition which includes Central Minnesota Municipal <br />Power Agency (CMMPA) as a participant. In September 2010, the Utilities Commission authorized <br />entering into "Phase 2" of a resource planning study which includes the release of a Request For Proposal <br />(RFP). The RFP was issued on November 15, 2010. In May 2011, the Utilities Commission authorized <br />entering into "Phase 2b" of the resource planning study which will include risk assessment of the <br />proposals. <br />DISCUSSION: <br />The list of bidders has been shortened and CMMPA is looking to schedule a presentation with the <br />participant's power planning committees soon. A presentation will be made to the Commission at a later <br />date. <br />Concurrently, staff has been meeting with Connexus and Great River Energy (GRE) on power contract <br />renewal options. As previously discussed with the Commission, the power contract renewal bid proposed <br />by Connexus and/or GRE will be compared with the results from the RFP process. This comparison will <br />be conducted by a third party, R. W. Beck. On June 9`h ERMU, Connexus, GRE, and R. W. Beck held a <br />meeting to discuss methods for comparison. The key to this bid may hinge on ERMU's position on <br />territory acquisition. <br />ACTION REQUESTED: <br />No action required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.