Laserfiche WebLink
1~~ // <br />Elk REQUEST FOR ACTION <br />River <br />TO ITEM NUMBER <br />Ci Council 3.7 <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Consent A enda une 6, 2011 T. ohn Cunnin ham, Fire Chief <br />ITEM DESCRIPTION REVIEWED By <br />Authorization to Proceed with Pump Installation for Tanker 2 Tim Simon, Finance Director <br /> REVIEWED BY <br />ACTION REQUESTED <br />Approve proceeding with pump installation and fabrication for Tanker #2 (award to Midwest Fire <br />Equipment and Repair, Co.) <br />BACKGROUND/DISCUSSION <br />At present, Tanker #2, which is assigned to Station #1 on Jackson Ave., is not equipped with a <br />permanent mounted fire pump. It has been the goal of the fire department over the past few years to <br />equip this truck with a pump, similar to the setup of Tanker #1, which is assigned to Station #2 on <br />Orono Parkway. The addition of a PTO driven pump will provide greater versatility, particularly when <br />responding to grass fires and other incidents requiring copious amounts of water. This project has been <br />delayed for a number of years in order to fund other capital expenditures. <br />The Elk River Fire Department solicited quotes from two qualified vendors with the experience, training, <br />and background in installing fire pumps and fabricating fire vehicles. The quotes are: <br />• Engle Fabrication, LLC: $26,477.00 <br />• Midwest Fire Equipment and Repair Company: $28,000 <br />Both quotes were based on the same specifications. Both companies also provided details on the <br />warranty for both hardware and fabrication, which was also taken into consideration when evaluating the <br />proposals. Engle Fabrication will provide a three (3) year warranty on the pump and a one (1) year <br />warranty on all parts and fabrication. Midwest Fire Equipment and Repair Company will provide the City <br />with a five (5) year warranty on the pump and a ten (10) year warranty on plumbing. Given the critical <br />nature of this apparatus and the costs associated with pump repairs, the fire department highly <br />recommends that the warranty terms be taken into consideration, and, as such, award the project to <br />Midwest Fire Equipment and Repair Company in the amount of $28,000. <br />FINANCIAL IMPACT <br />$26,000 has been budgeted in the equipment replacement fund in 2011 for this project. There has been, <br />and continues to be, an increase in materials/labor since this project was originally planned and budgeted. <br />As the result of selling old equipment, the fire department does have funds available to cover the <br />remaining $2,000 costs associated with this project which will not require any additional contribution <br />from the equipment replacement fund. <br />N:\PubGc Bodies\City Council\Council RCA\Agenda Packet\OG-O1-2011\Tanker.docx <br />