My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.2.A. PRSR 10 13 2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2004
>
10-13-2004
>
9.2.A. PRSR 10 13 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2011 11:22:33 AM
Creation date
5/24/2011 11:22:33 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
10/13/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM # 9.2.A. <br />MEMORANDUM <br />TO: Park and Recreation Commission <br />FROM: Bill Maertz, Parks and Recreation Director <br />DATE: October 4, 2004 <br />SUBJECT: 2005 Parks Capital Improvement Plan <br />As a beginning of the Park Capital Improvement Plan decision making for 2005, I have <br />listed some potential projects along with very preliminary cost estimates. The Park <br />dedication Fund has a balance of 1,483,347. Please review these potential projects. Staff is <br />looking for direction before preparing more precise cost estimates. <br />PARK <br />NAME IMPROVEMENT COST Comments <br />Tra[t Braok Trail 20,000 Connects [o North <br /> Tennis Court 35,000 Firs[ Court Eas[ of 169 <br /> Benches & Tables 3,000 <br /> Picnic Shelter 10,000 Small Shade SVUCture <br /> Baseball Backstop 3,500 <br /> Parking Lo[ and Landscaping 20,000 Bermed [o screen from neighborhood <br />Total <br />Meadowvale <br />Heights Trails 95,000 Portion to be consVUCted by developer <br /> Boardwalk 15,000 300 Feet <br /> Playground 20,000 Swing sets, Climbing Rock, installed <br /> Benches & Tables 3,000 <br /> Shelters 50,000 <br /> Engineering 24,000 Wetlands Issues <br />Total Will Apply for DNR Grant <br />Kliever Poiot Park Playground 60,000 Turnkey installation <br /> Trail 4,000 Connects North to South <br /> BB Court 2,000 Half Court <br /> Seal &SVipe BB Court 1,000 <br /> Benches & Tables 2,000 <br />Total <br />Woodland Trails Interpretive Signs 20,000 <br /> Entrance Sign 5,000 <br />Total <br />Ridgewood East Seal &SVipe BB Court 2,000 <br />Taal <br />Riverplace Seal BB Court 2,000 <br /> Picnic Tables 1,500 <br />Total ~: ~,,.:, <br />Mississippi Oaks Benches and Tables 2,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.