My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 03-21-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
03-21-2011
>
5.3. SR 03-21-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2011 10:32:57 AM
Creation date
3/18/2011 10:31:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Ci Council 5.3. <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Administration March 21, 2011 Chris Leeseber ,Park Planner-Planner <br />ITEM DESCRIPTION REVIEWED B~/ <br />Monitoring Well Placement in Windsor Park Steve Benoit, Recreation Mana er <br /> REVIEWED BY <br />ACTION REQUESTED <br />Staff and the Parks and Recreation Commission are recommending the City Council approve the <br />placement of a monitoring well in Windsor Park as requested by the Minnesota Pollution Control Agency <br />(MPCA). <br />BACKGROUND/DISCUSSION <br />Staff was contacted by Peer Engineering, on behalf of the Minnesota Pollution Control Agency, about <br />the possibility of placing a monitoring well in Windsor Park. They have identified an area in the <br />southwest corner of the park. A representative from Peer Engineering was in attendance at the Parks and <br />Recreation Commission on March 9, 2011 to provide information on what is being proposed. <br />The well will be approximately 20 feet deep and will have to rise above grade at least one foot. The time <br />frame for the need for the well was assumed to be indefinite, pending state funding. Peer Engineering <br />identified the south west corner due to the easy accessibility. They indicated that the well could be in any <br />location within the park. <br />The Commission was in favor of the request but asked the engineers to work with staff and a <br />commission member in siting the well in a location that was not in one of the main access points of the <br />park. <br />FINANCIAL IMPACT <br />All cost associated with the installation, restoration, and monitoring of the well will be by the MPCA. <br />ATTACHMENTS <br />^ Location Map <br />^ Peer Engineering email <br />^ Fact sheet prepared by the MPCA <br />^ Site summary sheet <br />^ Well diagram <br />^ MPCA access agreement <br />N:\PubGc Bodies\City Council\Council RCA\Agenda Packet\03-21-2011\Monitoring Well at Windsor Park.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.